++Conceptual clock: 0.000000000000000E+00 Machines in use are: 0 Planning batch 1 Just-in-time delivery time: 1.628528809559157 Pieces to be delivered: 49.62446584884202 Optimal production per hour: 24.33000000000000 Optimal production cost per piece: 2.310000000000000 Time required at optimal rate: 2.039641013104892 Time available for production: 1.628528809559157 ----- Insufficient time at optimal rate. Therefore... Planned production per hour: 30.47196067859271 Planned production start: 0.000000000000000E+00 Planned production duration: 1.628528809559157 Planned production finish: 1.628528809559157 ++Conceptual clock: 1.628528809559157 Machines in use were: 1 Cost of batch 1 Per piece and total at optimal production rate: 2.310000000000000 114.6325161108251 Per piece and total at actual production rate: 2.523092251208479 125.2071052535731 Deviation from optimal total cost: 10.57458914274804 Maximum machines used: 1